Project Management & Accounting -1
Show More Show Less View Video Transcript
0:00
okay uh so today I'm going to start uh project
0:06
management accounting in uh last video I have covered few topics but I am going
0:12
to cover uh again uh lost topic concept as well as
0:18
this session I'm going to cover some few more uh topics types of projects individually
0:27
basic fixed price project creation how the entries will go time and material
0:33
project those things I'll cover so coming to project management accounting project what is Project
0:41
so any group of activities designed to produce any service produce an output
0:49
produce a uh to achieve your results by consuming the
0:55
resources or whatever required for that project by consuming those resources and
1:02
raw material to get the financial project or a finished product or
1:07
complete to achieve the results are providing any type of service
1:13
and it will create the revenues as well as assets
1:19
so that is project so any group of activities that will result to a
1:26
particular producing a product or service so that
1:32
that will generate you a revenues or fixed assets so that will be project for
1:40
example simple exam sample constructing a building or concept constructing a apartment is one type of
1:48
project so where we are using our raw materials as well as resources to constructability
1:56
finish achievement is fixed asset building is asset right so
2:02
uh final output is fixed asset
2:08
so in the same way we have two types of projects uh external and internal so
2:16
normally for external projects it requires contract if you are going to
2:23
take any external project from some other person then its Mustang should
2:30
have contract right so we'll have a contract but in case of internal project
2:37
no contract required because normally it is like
2:43
I have for office building uh
2:48
additional things if we are doing for the office own building then it will be
2:54
like uh internal contract internal project and if it is external project
3:00
for example you are taking a project from the customer and providing the
3:07
services like constructing a building those constructing a software those type
3:13
of stuff comes under external project and it contains contract external
3:21
project can requires contract so internal project no need contract
3:28
because it is for us only internal project won't generate Revenue
3:33
immediately it will generate revenues in coming future based on this
3:41
ah based on the activities performed in this project for a best example is that
3:48
in officers they will give some mandatory courses
3:54
and all that will mandatory courses or uh
4:00
for mandatory courses employees learning skills communication
4:07
skills those type of stuffs will be increased by uh
4:13
capability building so those things will cover and the internal project it won't generate any
4:20
Revenue immediately maybe after that employees got that particular
4:27
knowledge they will Implement that uh whatever they learned in the trainings they will
4:34
Implement in the project so that it will help to the business
4:39
so those are covers cover and internal projects
4:45
then coming to project management accounting
4:50
stages so normally there are
4:56
open Word document
5:01
normally there are there will be three stages in the project project initiate
5:07
project execute project and analyze project in the initial stage of the
5:15
project normally what are the activities will perform create send and confirm
5:21
quotations create project contracts project create project WBS
5:29
work break down stretcher create project focus and budgets build project team
5:37
these are the activities performed at the stage of initiate project
5:43
execute project in the execute project what we'll do enter the time time and
5:49
expenses manage forecast and budget transactions and monitor and digest the
5:56
WBS procure product and services recognize Revenue process project
6:03
revenues project invoices this will be covered under executive project
6:10
analyze project reviewing the profit and profit
6:17
profitable things and review invoices analyze cash flow analyze utilization
6:23
these are the things will perform at that time of analyze phase there will
6:30
be three types three phases initiate uh phase execute fish analyze phrase
6:37
initiate phase normally it will be a creation of fewer items like creation
6:42
and send of quotations create uh project contracts create WBS create forecast and
6:50
budgeting those are creation thing and execute project stage will enter the
6:57
transaction time and material produce the procuring the product or Services manage
7:04
forecast and budget this type of stuff under execute project analyze project reviewing the invoice cash flow and
7:12
profitability those type of stuff we'll check in the analyze phase okay coming
7:18
to the application part so first is navigation uh how to go to project management
7:25
accounting if you want to go to project management accounting modules we have
7:31
project management accounting and we have project management workspace
7:37
as well object management workspace
8:08
it's taking time
9:29
okay let's keep on loading
9:43
so I'll open USSA legal entity
10:06
okay if this is still loading meanwhile I'll proceed with a project creation how to
10:15
create project so go to project management accounting
10:30
it's also taking time okay it's came this one a workspace in
10:38
the project management workspace we have all projects to view all projects we can
10:44
click this one and if you want to check the project templates you can check it
10:49
here and we have journals here if you want to post any Harvest Journal expense
10:56
Journal item free Journal you can post from here for uh invoicing also we have
11:02
proposal as well project invoice here and the workspace itself inquiries and reports
11:10
and parameters setups as well we we have in
11:15
under project management workspace
11:21
same things will have under module itself if you want to go to uh workspace
11:28
to do this few activities you can do it or you can go to the particular module
11:35
and you can proceed with the activities why it's taking too long
11:43
okay so next is that project creation and sub
11:52
project creations how to do the sub projects and creation
12:00
of project normally sub projects will be used for example we have one project and
12:09
we have a phases phase one phase two like for example best example is Metro
12:15
project is there Metro project there will be some phases one care forum two
12:21
tin Factory one phase of Metro once this is complete this is like sub projects
12:27
and silk board to uh ah tin Factory one project one phase so
12:34
that means a Metro is the uh header project and we have sub projects like KR
12:42
purum two twin Factory and silkboard to Tin Factory so for that we need to create the sub
12:50
projects right so that will do here what is the use of sub projects to
12:56
differentiate um one night
13:03
okay then we have for example if you want to
13:10
client request you to build the bill time and material during a fixed price
13:16
project fixed price project will be the top under fixed price project there will
13:21
be time in material project there is there will be time and material
13:28
project which will provide you uh to book a time and material
13:46
okay then these are a few scenarios where uh sub projects required
13:55
so now we'll proceed to create uh projects
14:02
and before creating the project I'll show one feature under project
14:08
management parameters how the uh sub project format will be designed
15:12
okay in the project management accounting parameters we have default
15:18
sub project format uh here hyphen uh two
15:23
hash are there that means if your project ID is 1000 uh your sub project
15:31
ID will come for for the header project is 1000.01
15:37
000 hyphen zero one or dot zero one so it is a suppression of separation
15:43
from the header project so how it will come so this is the
15:49
format here and default project type we have whenever you are creating project types
15:56
I will explain in a bit later uh so normally if you want to default any
16:02
project type while creating the project currently it is time and material
16:08
automatically system will pick the time and material project while creating the project as a default
16:15
okay these are the projects we have and let's go and create the project now
16:23
go to project management accounting all projects
16:30
so I'll create one header project and sub projects
16:49
see here time and material project came automatically because default project
16:54
type is time and material so that's why it scheme as a time and material I'll
17:00
keep the same and I'm going to create uh
17:07
I'll give Vinnie head project
17:16
and project group those things will discuss anyway currently I'm taking one
17:22
of the group which is already there even contract as well I am taking one of the
17:28
contract which is already there project contracts also in coming episodes we'll
17:34
discuss how to create and what are the main fields in
17:39
the project contract customer is selected based on the project contract
17:47
and if you want to give any project manager to the project you can select
17:53
the resource I'm selecting one of the resource as a project
17:59
manager then create it so once you you click the create button
18:06
it will create the project
18:25
hmm once the project is created
18:31
how to make the project as a header project
19:17
okay now it's created the project so if you see here to make this project
19:23
as a header header project uh uh no need to book the transactions if
19:31
you want to make it as a header project and you can post the transactions at the
19:38
sub Ledger sub project level so to make this project as a header project we have
19:44
project hierarchy tab in under project hierarchy tab you have option called
19:51
header so when you make this project as a header
19:59
what I'll do is that once now it is Project is which stage
20:05
it's created status where it will be created stage currently project stages
20:14
also I'll explain bit later currently it is created status
20:19
stage created stage if you want to change it to
20:26
in process in created State system won't allow you
20:33
to post any entry so I am changing it to in process stage currently this project
20:39
is in in progress or in process so once project is created and when the
20:48
project is in in process stage you can go to Project tab I am trying to
20:57
create the hover Journal here
21:04
new original so this journal name it is Journal name
21:11
this this also I'll cover in the coming uh maybe next uh within one hour
21:19
so once this is create new uh our Journal taken click on the lines
21:26
so see here we are creating our journal for the
21:32
project this one which we created just now the project 153 is defined as a
21:39
header project registration should be done under sub projects that means
21:44
header project system will not allow to post any entries if you want to post any
21:50
entries under this project create a sub project and make your
21:56
transactions that is what it is saying so I am deleting this
22:05
so once that's completed and
22:11
this is defined as a header project now we'll create a sub projects for this
22:19
Pro under this project So currently we are under Winnie header project this is
22:24
153 project number and if you want to create sub project we have option called
22:31
sub project here so click on the sub project once you click on the sub project see here
22:38
hyphen01 it's came because of the format defined under project management parameters
22:47
I showed on the project management parameters we have a format that's why
22:53
it is speaking uh like this hyphen 0 1 1 till 1 5 3 is a header project number
23:01
after that hyphen 0 1 it's referring to the sub project
23:08
so I'll do so maybe I'll give you the same naming we
23:14
need sub 1. so that means we need a project one and
23:20
I am not changing any project groups contracts and all it's uh covered under
23:27
the same project group as well as project contract so that's why I'm not
23:32
changing anything and let's click on create
23:49
see now header project is this one and sub project this one
23:55
okay if so currently sub project is in created status stage if you want to
24:03
change it to in process go to Project stage and change it to
24:09
in process when this project is in create status also it will give you the
24:15
same error message saying that project is under create a state stage won't
24:22
allow the allowed to post the transactions so I'm giving in process
24:29
and one more thing if you want to create one more sub project for example I have
24:35
header project one header project and under header project I have one once two
24:42
sub project sub project one and sub project two if you if I want to create
24:47
the one more sub project under header project if I select this one and click
24:53
on sub project it will create under the sub project that means Sub sub project
24:59
will create it won't create the sub project so if I want to create sub project under header
25:07
project again click on the header project then click sub project
25:13
so it will give the 0 to number so I'll give the naming
25:20
sub 2.
25:42
okay this is the creation of sub projects next coming to project number
25:49
sequence this project number sequence uh you know very well number sequence will
25:56
be under project management parameters
26:04
so how it is coming 153 is based on the number sequence defined under the
26:10
parameters
26:25
next I'll proceed with one more thing
26:31
copies of project anyway that number sequence one you are aware of project ID
26:39
number sequence will be there under project management parameters they from there it is speaking based on the format
26:50
so coming to copy projects so for copy project I'll do one more
26:58
thing I'll create new new project
27:08
time in material copy approach temp
27:14
so I am creating the template now so how we can make the template
27:20
so template means we are just creating we are just providing all the details
27:26
we'll mark this project as template not for the
27:32
postings not for the any type of ah activities it is just for an template
27:41
will use this template and create n number of projects by using this
27:47
template previously we discussed about project
27:53
header now it is Project template so in under
27:59
same project hierarchy we have option called project template we are marking
28:06
this project as a project template so once the project template created
28:20
I'll do copy project
28:25
so whenever you want to create any Project based on that particular template
28:30
you can use the template from here see
28:36
whatever we just created as a template time and material copy project template
28:42
it is available under the drop down so what is your parent project if you
28:50
have any parent project you can select it otherwise no need to select use
28:55
template name if you want to select it you can take it so I am not giving any
29:02
parent project so contract details these are these came from the template so I am giving the
29:10
same details I am not changing anything if you want to change you can change it and delivery address copy the address if
29:18
you want to copy this address as a delivery address you can copy it
29:24
enable this particular field and financial Dimensions it is coming from
29:30
the project template and I am giving the same not changing
29:36
anything and if you want to do any activities purpose this project is creating you can
29:43
select it and pay when pay required you can enable that as well
29:49
so it is time and material project so these most of the fields are disabled
29:55
status so this is the project ID now it is creating
30:05
finish so this is a way
30:10
we can create the project using copy wizard functionality if you
30:17
go back and if you search for that project you will get that project in the
30:22
list
30:35
see 155 this is the project just created this is created stage
30:41
155 is project if you want to change the naming I forgot to change at the visual
30:49
level so if you want to change it you can change from here
30:54
okay this is another concept which we already covered it but I am
31:02
covering one more time so you can change here
31:09
Diamond material
31:16
any project
31:22
and coming to stages project stages see if you see here
31:28
project stage we have different type of stages under the project stage drop down
31:35
uh like created in process approved and
31:40
closed status these are the stages it is showing as normally these stages will be
31:48
under parameters we can Define ah
31:53
how this status do you want like whether I hear it is
32:00
created in process and later on approved something closed estimated like that it
32:06
is there you can change the naming as well for created initiate or
32:13
initiate like that you can provide if our in process you can give in progress
32:19
like that you can change the naming conversion as well from the
32:25
project management parameters if you go to project management accounting
32:41
parameters
32:53
hmm stitches
33:10
it will be indoors
33:16
here project stage see these are the different types of stages created we
33:23
have estimated scheduled in process and finisher stage
33:28
we have user defined stages as well you can create three types again you can
33:35
name it as different namings here and we have option to change the naming
33:42
conversion this is standard namings and you can change in different namings as
33:48
well for example initiate no not initiate I'll give
33:55
created only and I'll change this as
34:00
in progress and this one instead of closed I'll use
34:07
finished whatever the changes you did here same way it will appear in the project
34:14
form as well so currently you see here for time and material project we have
34:20
given created estimated uh approved here given instead of approved I'll give I'll
34:27
use the same naming as scheduled so we changed only in process in
34:35
progress and finished so time and material these are the things enabled
34:42
okay if you want to remove this schedule you can remove and save it then after
34:49
removing if you go to all projects let's check it out how it will looks
35:03
so our our project is maybe I'll use
35:09
hold in latest to oldest and 155 is our project
35:16
let's go to projects tab project Group C in progress game
35:23
finisher came previously it is different right and we disable the schedule that's
35:29
where schedule is not coming if you enable the scheduling as well for the time and material project once you save
35:38
it if you want check it out
35:43
schedule also game so these are the project stages we have
35:49
project staged rules as well here
35:55
if so this is uh project time and material project if
36:02
what are the things that you need to perform at this level So currently
36:10
so for example let me one minute let me take this one first line
36:17
and select the stage rules So currently it is created a
36:25
beginning balances create forecast create quotations that means when the
36:31
project is created stage you can do these activities
36:37
so those are allowed if it goes to in broker in progress stage
36:43
you can check the stage rules it is creation creation and quotation
36:50
creation create item Stars create journals as well invoices as well you
36:56
can do that so at what stage what activities you need to perform that is
37:02
Project stage rule okay so this is one thing
37:09
let me go to another topic
37:17
okay so as I told uh in the starting of
37:23
the session we have two types of projects one is external and internal external project not required contract
37:32
because we are going with external positions and internal projects not required contract
37:38
so if in the external projects we have time and material project and pixel
37:43
price project two projects and in the internal projects we have four projects investing sorry investment internal cost
37:52
time in uh investment internal cost and time these are the
38:00
four projects we have under internal project
38:06
coming to time and material project normally timing material project means
38:12
uh invoices will be based on the material labor or some expenses consumed
38:19
for that particular period so that will be ah time and material project
38:26
it will be ability to track the cost in WAP account revenues as well accrual
38:33
revenues as well normally these type of time and material project used for
38:39
example construction projects uh product development Consulting projects
38:45
okay that's about a time and material then under external project we have one
38:51
more project called fixer price project under fixed price project will
39:00
actually will actuals are not invoice fixed contract amount an account
39:06
transactions also we can book Revenue recognization we can perform it and
39:12
normally these are examples like installation construction and Consulting and internal project next is coming to
39:20
internal projects under internal project internal project means for our
39:27
organization purpose if you are doing in a some
39:32
software installation or building extension or something else
39:38
so that is internal project cost project it is cost project also it is similar to
39:44
the internal project um and uh
39:50
cast can cannot post to WAP under cost account and the investment projects we
39:57
have no immediate entrance fixed as a item from the investment projects
40:02
typically fixed asset will be generated in future and Time Project labor recordings only
40:12
like if employee kept any leave
40:18
which is as per company's policy PTO sick leave those type of things will
40:24
cover under Time Project this is internal only
40:31
so these are the four projects and internal in internal projects we have
40:37
internal investment cost and time so internal it will be like project
40:44
software installation those type of stuff stuff and uh cost price are so
40:50
same thing similar similarly similar as uh internal project and investment
40:57
project no immediate endings will be there it will be a creation of fixed
41:02
assets at the end of the project and Time Project it will record the hours
41:09
for sick leave or ptos for that time project is required external anyway I
41:15
discussed time and material project as well as fixed price project
41:22
okay so that project types you can see here while creation or you can go to
41:30
project management parameters there you can see under the default thing and let me show you uh
41:38
here at the time of creation what are the types available
41:44
to create the project
41:54
see Diamond material we have fixed price time and material and fixed price
41:59
belongs to external project next in investment cost price cost project
42:06
internal Time Project these are internal projects
42:11
okay coming to transaction types transaction
42:17
types we have five types of transactions hover journals expense journals item
42:26
fees on account transactions on account transactions will be under
42:33
main step okay
42:38
and all normally hover journals will post uh for example Consulting installation
42:46
setup ah consuming hours those type of how much
42:52
how many hours spent for installation how many hours you spend for doing uh
43:00
for particular activity those type of things will be covered under
43:06
item Journal item Journal will be materials subcontracted Services if you
43:12
are doing dealing with materials those will be covered under items and expense
43:19
Journal like airfare hotel parking these type of things uh
43:26
will cover under expenses fee service fee delivery fee surcharge will cover
43:32
and the fusional on account transactions it will be prepayment schedule payments those type
43:40
of things will cover under on account transactions in the time and material projects normally use prepayments and
43:48
fixed price project schedule payments will perform okay these are the things and
43:56
when when our Journal will be created our Journal will be used for timesheet
44:03
time sheet means whoever working for any for example I am working for a project
44:10
called a for project a how many hours I spent I need to submit the timesheet
44:16
this will be covered in the later sessions so that you will understand clearly so timesheet will submit this
44:24
many hours I worked for this particular activity under this project and item
44:30
item uh journals will be created uh through we have document pivo purchase
44:38
order sales order production order item item Journal item requirement
44:46
a AP invoice these are the documents for items you know for expense Journal it
44:52
will be expense report AP invoice Journal GL Journal project expense
44:58
Journal as well so from these many places we can create the expense journal
45:03
from here from a from GL from AP invoice
45:08
from Project expenses expense report these are the things fee Journal
45:15
normally will use only project management accounting to book the fusionals
45:21
anacond transactions it is customer Advanced those type of things we can book under on a contribution
45:30
on a constant customer advances okay
45:39
and coming to project categories
45:44
preparation of cost and revenue defined by the so project categories means
45:52
categorizing the expenses or revenues which are like similar
46:00
which are similar type of categories we will group it as a project categories
46:11
so for example project categories under expense we have travel and marketing
46:18
under travel we have air airfare hotel like that we can categorize into
46:25
different categories we have shared categories project
46:32
categories uh category groups there are three types of categories
46:39
I'll show you
46:57
I'll search with project
47:04
see here category under categories category groups sharer categories
47:09
project categories so these are the three types we have
47:26
okay so setup of shared uh categories
47:32
for example I'll just show how to create the shared categories
47:45
so here this is the form where we can create the shared categories for example
47:51
you can give
47:58
HR
48:04
hours shared category
48:15
so and we have few options called can be used in Project whether this category ID
48:23
you want to use in the project or can you use it in the production or can be
48:30
used in expense if you are using uh this category for project purpose enable this
48:38
if you are using uh this category for expense as well then enable this and uh
48:45
uh select the expense category currently I am creating for hover purpose so I am
48:52
not enabling the expense when the category is defined for the expense you
48:57
can enable it and you can select the expense type
49:05
so this is a shared categories and
49:12
category groups we have
49:29
so this is category groups you can categorize into grouping
49:38
for example
49:47
so here was
49:56
I was getting ready you can select the type of the
50:03
transactions category name
50:08
get group and line property whether it is billable
50:15
or non-billable you can create the line property as bill by clicking right click
50:21
on view details and if you want to map the main accounts at the category group
50:26
level you can map it or you can you can directly map under the
50:31
Ledger postings
50:37
this is another one and last one is
50:44
shared categories project categories and category groups now project categories
51:02
shared categories normally we can use for all the legal entities if it is
51:07
shared categories if it is uh project categories it will be applicable
51:14
for that particular project where you are creating this is ID name uh use in
51:20
expense if you want to use this categories in expense you can enable this or if you want to use this expense
51:27
in production you can use it and category Group whatever the category
51:32
groups we just created right that category groups you can map here
51:38
and once it is mapped we have a few things main accounts if you want
51:44
to map it you can map it or if you want to use for a estimate AdSense this will
51:51
will cover later so this is one thing let me create otherwise
52:03
so of us cat ID
52:14
maybe L select here shared category which we already created
52:20
here no need to give anything it will pick automatically based on your previous
52:27
setups ours is something like yeah our scad
52:33
group so once selected save it so now we covered uh
52:41
project category so till now what we covered navigation how
52:47
to create the project and how to make it as a header how to make it as a template
52:53
how to create the sub projects and or header project
52:59
and then copy wizard functional through copy wizard functionality creation of
53:04
projects project number sequence where it will be available and there are two
53:10
types of projects one is external and internal under
53:16
external contract required internal contract not
53:21
required and later on we have two types under external projects Diamond material
53:28
and fixed price under internal project we have four internal investment
53:35
cost as well as time those are the projects we have
53:40
and later on what we covered I think transaction types we have hover
53:49
Journal fusional expense journal and on account journal and one more uh is item
53:58
Journal five types of journals we have and what when those uh
54:05
documents will be created however Journal it will be from however Journal directly timesheets and item Journal we
54:13
can create from different parts purchase order sales order production order item
54:18
Journal item requirement AP University expense Journal we can create from
54:23
expense report AP invoice Journal general journal as well as uh
54:28
project expense journal and fusional only from one place that is from fee
54:34
Journal Anaconda Journal it will be on account and customer advanced
54:40
later on we started with a project categories project categories there are
54:45
three types shared categories shared categories we can use for all the legal
54:52
entities and category groups you can define a
54:58
category groups as well whatever you can group it out and
55:04
project category we have so till here we can map the main
55:10
accounts at this level as well category ID level and project category level
55:17
project group group category level and
55:25
coming to uh prices
55:50
ah see coming to prices we can Define ah
55:55
cost price for our cost price for expense cost price sales price for our
56:02
expense sales price for free subscriptions transfer price these many
56:08
prizes we can Define for example cost price for our
56:16
so cost price for our expense we can Define as well as sales prices also
56:25
we can Define so here
56:31
for example new I'm taking effective date may be 30th so you can
56:39
Define role resource wise that means ah
56:45
when the vinod spends eight hours for for example we know spent one hour what
56:53
is the cost per cost per one hour if some other person uh
57:00
some Raju or prabhas spend one hour then
57:05
what is the cost price we can Define here from based on the resource level as well here
57:13
see you can check here um Road
57:18
and he covered under a category project manager then he'll get this much cost
57:24
price this is the cost price for that person you can Define at the resource
57:30
level or customer level project contract level category level if you want to book
57:37
category level you can do that as well so for example
57:43
our shared category this is cat we have defined if you want to Define this cost
57:51
only to the particular project whenever you book cover Journal only to this
57:56
project and this category then this cost will applicable and if you provide the
58:02
resource as well when you book The hover journal for this resource this category
58:07
and this project then you will get that cost price while booking the
58:13
transaction okay I am not selecting any
58:19
project now maybe I'll use the different amount like
58:26
triple seven okay
58:31
okay then sales price also you can Define from here itself and
58:41
sales price uh for our you can Define expense
58:50
so here you have different fields as well here as here also you can Define
58:56
uh category level what is the category that you want these sales price you can
59:04
categorize and resource level we have project level
59:11
project contract level and customer level you have many levels we have we
59:20
whatever the requirement is there you can follow that Maybe
59:25
I'll use triple six
59:31
so table we given here ah maybe I'll use one project
59:40
153 we created right anyway
59:48
155 I guess
59:55
okay so project level I defend here
1:00:00
okay this is uh pricing pricing things
1:00:06
and project pricing
1:00:17
cost price we defined
1:00:26
project contract level also you can Define prices uh go to Project contracts project level
1:00:35
also you can Define and the inventory management we have
1:00:40
price and discount groups there you can Define the prices that will appear here
1:00:47
later uh see here
1:00:53
cost prices sales prices you can Define from this level as well
1:01:01
okay and before that I forgot to
1:01:10
tally one topic for example
1:01:17
our sales price per hour we have one ah
1:01:25
topic here under sales prices sales price Model and we
1:01:33
have a different type of methods here let me show you
1:01:40
quantity it is amount entered in the sales price will pick if you select
1:01:45
quantity what is the amount entered that will be picked if it is contribution
1:01:50
ratio if it is contribution ratio Formula will be 100 into cost price
1:01:56
divided by 100 minus uh contribution ratio for example hundred
1:02:02
into cost price here 100 is 100 into 100 10 000 10 000 divided by 100 minus
1:02:10
contribution ratio contribution ratio if it is 20 uh then uh minus 20 10 000 by
1:02:17
80 what is the price that will be picked and we have can't change
1:02:25
sorry charges percentage cost price into 100 plus pricing percentage divided by
1:02:33
100 that is the formula and charges amount we have one more method cost price plus charge amount what is the
1:02:40
cost price defined and what is the charge amount you define that will be your cost that will be your sales price
1:02:47
sorry okay
1:02:52
so these things then let's go and create the while
1:02:59
creating the project creation I told you there are few uh
1:03:06
topics project groups uh those I will cover later so let's go and create one
1:03:12
project now
1:03:26
so under postings project groups
1:03:40
so if you want to map a similar type of group projects into one group you can do
1:03:48
it Diamond material G r p
1:04:01
time and material project and if we have project type here
1:04:09
whatever the project type that comes under this project group you can select
1:04:15
it and I selected time and material project Ledger posting such priority for
1:04:22
posting the transaction what is the such priority that you can search priority
1:04:29
that you can inform to the system and line property search priority also you
1:04:36
can Define here and we have here ledgers where to book
1:04:41
for time and material uh post costs hours to uh whether you want to post
1:04:49
this to penal account or balance sheet never let your knowledge
1:04:54
you can select that so I am selecting a penal account for
1:05:00
all the item expense as well as our journal and on account transactions it
1:05:06
is balance so if you are booking any revenue of
1:05:13
hours you can revenues accrued revenue or for expense
1:05:18
however that you can enable and this fix Enterprise estimates this
1:05:26
Fields or disable status because it is time and material project if you enable
1:05:31
the uh sorry if you select the fixed price project then only these fields will be available and you have
1:05:40
if you want to map here you can map it or you can map it the laser posting
1:05:46
level if it is mapped here it will take from here when you book to this
1:05:52
particular project group otherwise it will go and search further uh main account in The Ledger postings
1:05:59
project management Ledger boosting if you see this one
1:06:05
fixed price see these fields are enabled and they
1:06:12
selected so this is
1:06:18
project groups
1:06:59
okay project line
1:07:15
line properties uh next topic is line properties we have
1:07:22
two types line properties and project group line properties let's create a
1:07:27
line properties so we have billable and non-bill level
1:07:35
if so line property name description whether it is chargeable while invoicing
1:07:42
or non-chargeable you can enable WAP cost you need to post you can enable it
1:07:48
and capitalize cost if you want to capitalize the cost you can enable this
1:07:53
one so for non billable it is
1:07:59
not not chargeable accrued Revenue also not required capitalized cost is enabled
1:08:08
whenever you if you want to assign the line property to the project
1:08:15
you can go to a particular project and select the line properties
1:08:28
okay and then main thing is
1:08:36
project posting profiles
1:08:42
posting Ledger postings
1:08:48
where we need to map the main accounts for posting the transactions we have
1:08:54
cost accounts and revenue across two types of accounts and under the cost
1:09:00
accounts we have different type of uh
1:09:05
categories cost for cost purpose for cost booking purpose what is the
1:09:11
requirement here uh project relation project wise you can book project group
1:09:18
wise you can book or you can group you can map the main account at the
1:09:24
category group level all category or particular category level you can map
1:09:29
the main account for posting the cost this will be normally used at the time
1:09:38
of time and material fixed price investment cost internal and time
1:09:43
uh this will be basically a penal account because it is cost right so
1:09:54
our expense and item transactions it will book then W and then we have WIP uh
1:10:03
cost value this will be balance sheet account uh it will be post hovers
1:10:10
expense journals it will be used in the time and material fixed price investment
1:10:16
cost internal projects it will be like a balance sheet account same then cost
1:10:22
item we have penal account it will use for item transaction purpose
1:10:29
and payroll allocation this one payroll allocation it is a
1:10:34
penal account for our Journal purpose we'll book this will map this account inter company uh
1:10:41
cost it will be used for however Journal as well and time and material fixed price
1:10:48
in investment cost internal Time Project all the projects it will be useful
1:10:57
and we have a crude loss this is penal account it will be used for fixed price
1:11:03
and WIP accrue loss this also will be uh
1:11:09
fixed price project uh for estimation and revenue accounts we have different
1:11:16
types of revenues
1:11:29
okay this will cover later
1:11:35
after Ledger posting setups
1:11:40
so I'll do one thing for cost project
1:11:47
for cost I'll map One account anyway we created
1:12:03
I'll use different very pecular account
1:12:08
maybe L I'm just using some account like flight transport
1:12:14
which is deferred to these accounts to recognize easily
1:12:21
okay category not selected
1:12:32
okay and payroll allocation also I'll select
1:12:39
one thing
1:12:45
okay anyway payroll allocation all all is there so if you book for any project any
1:12:52
category it will be this account
1:12:59
let's go to Project which we created just we'll post on our Journal
1:13:25
so
1:13:38
155 this project it is in created stage
1:13:46
let me change it to in progress Tree in process stage and
1:13:52
we'll check the project
1:13:58
group s and let's change it to
1:14:12
progress
1:14:30
okay so we changed it to in process
1:14:36
let's create now let's check project group as well
1:14:42
group in the project group what is the account we selected for cost booking
1:14:48
that will check it out so we selected balance sheet
1:14:55
balance let's go and post the transaction our Journal let's create the
1:15:02
hover journal for this project and I'll show you how it will behave
1:15:25
okay new line
1:15:40
so today's date and
1:15:48
I'll select the category as
1:15:59
for this I missed something to tell you okay
1:16:05
I'll select one of the category same category I'll put maybe and resources this one
1:16:13
and how else I am booking is four hours
1:16:20
and let me post
1:16:34
I'll show you the uh which main accounts was picked
1:16:39
I I selected the category of PM
1:17:14
we'll book all type of journals and we'll stop this session
1:17:20
next Concepts will cover under later so category pm
1:17:27
let's check the category group as well for the PM so for this PM category category group
1:17:36
is Project okay so now
1:17:41
go back and check the posted transactions under
1:17:48
project so four hours I booked under many step
1:17:56
for that particular project we have posted transactions
1:18:11
so here view voucher 800 how sorry
1:18:17
sale price 1400 came and cost total cost which came as uh 800 how this came those
1:18:27
analysis will do now which accounted Book Project WIP cost
1:18:33
and project payroll allocation so what are the accounts one six zero one
1:18:40
hundred and six zero to one hundred from where these accounts is picked for This Server Journal posting
1:18:47
let's go and check
1:19:14
I'll go to Ledger postings under project management module
1:19:33
see here WIP project costs it's taken
1:19:42
so this one so now we selected PM right category PM
1:19:48
comes under category group project one six zero one hundred
1:19:54
oh sorry I'll put like this maybe
1:20:00
to better understanding so 1 6
1:20:15
okay one six zero one hundred this one
1:20:21
it's debited payroll allocation
1:20:27
so what is the account mentioned here 6 0 to 100
1:20:32
so credited then one more thing how 800
1:20:38
came that we need to check now so from where 800 picked
1:20:47
uh sales price I'll pay
1:20:53
cost price per hour cost price per hour
1:21:01
it is for the PM
1:21:06
PM category right so I'll filter with PM category
1:21:16
so latest is new vegetable list
1:21:25
and we booked two particular
1:21:30
resource I guess Julia
1:21:35
Julia it is covered here no no Julia so then it's taken from here
1:21:45
so 200 cost price we booked four hours four
1:21:51
into two hundred a 800. okay that is what it's picked from here
1:22:00
okay then what else I can show here
1:22:09
okay then this is the one and why it is booking to WIP that I need to tell you
1:22:17
uh when it will book to waip cost when it
1:22:22
will book two project cost I'll tell you um
1:22:30
where is this
1:22:35
project group what is the project group for this
1:22:40
particular project
1:22:55
so let's attach here
1:23:02
okay so project group is TM node WIP
1:23:10
so I'll do one one more correction in the project group level it is balanced
1:23:17
right now I'll change it to penal account
1:23:23
and let me go to the project and post the hover
1:23:29
Journal and see the difference how it will look
1:23:38
okay new I'll take the
1:23:47
sorry lines
1:23:52
new line
1:23:59
I'll take the same things four hours
1:24:06
and post it
1:24:19
okay once this is done
1:24:24
go to manage tab poster transactions
1:24:34
uh let's I don't know which one is Lady
1:24:41
okay let me check both the things
1:24:47
see here WAP cost and uh payroll allocation input
1:24:52
first line let me go to second line and check it
1:24:57
out see project cost it's book debit and payroll location is credited
1:25:05
so like this it will work and uh
1:25:12
we are in Project so if you want to
1:25:17
do the invoice proposal you can do from manage tab we have invoice proposal
1:25:24
option you can do from here as well and we have to uh
1:25:30
transactions and uh invoice proposal these are hover
1:25:36
journals what we just posted those came for invoice proposing
1:25:43
okay I'll discuss these things maybe again later
1:25:49
and you I think you understood the hover Journal now I'll proceed with uh expense
1:25:57
Journal uh and before proceeding with expense
1:26:03
Journal I'll show some default setups
1:26:08
and parameters for the journals
1:26:19
uh journals you have options so what is the default
1:26:26
things default Journal names what are the default Journal names you want for our Journal expansion you can change
1:26:33
that uh Journal names and you can make it as a default and default category you
1:26:40
can make from here whenever you are booking our Journal PM is the default one adjustment we created for you our
1:26:48
Journal site there it's by default it is coming with PM that is because of this
1:26:54
thing okay this is uh one thing and one more
1:27:00
uh thing is that uh Journal names creation normally Journal names creation
1:27:06
for however Journal we have uh under project management under project
1:27:14
management will create the hover Journal name for expense will create under GL
1:27:20
for item it will be Inventory management fee and beginning balance uh will be
1:27:27
project management under project management so let's uh
1:27:34
create Journal names now
1:27:44
uh Journal see here journals and
1:27:52
project main sorry under projects Journal names will be uh
1:28:04
for our Journal it will be created under project management so here our Journal
1:28:11
this one I showed you right this hover journal from where we'll create
1:28:27
see here Journal names we have under Journal names
1:28:34
see here our Journal we can create here and you need for our
1:28:40
Journal you need to select the you must in you must select the hover type see for
1:28:48
from the project management we can create the journal names only for our Journal fee journal and beginning
1:28:55
balance we have three types only and expansional it will be from GL and item
1:29:04
Journal it will be from Inventory management I'll show you these three are from
1:29:10
project management you understood and
1:29:19
this is one thing
1:29:26
okay let's start with expense Journal expense Journal will be created from
1:29:33
GL Journal sorry general ledger
1:29:40
Journal names normal Journal names and type should be project expense
1:29:46
normally we'll put daily allocation those type of stuff right so
1:29:52
here project expense this is the journal we have Journal name
1:29:58
we have so it is prj jrn
1:30:06
let me go to
1:30:12
project management and I'll create the expansion
1:30:18
for that project same project we'll use it
1:30:25
all projects
1:30:44
so just now we created our journal and we are starting with expansional now
1:31:24
huh
1:31:30
new this name how it is coming this name is coming
1:31:36
from the GL General general lejo journal names from the
1:31:43
general ledger Journal names it is coming that too project type sorry
1:31:50
Journal type should be project and expense then only it will appear here
1:31:56
in the drop down list and clicking lines
1:32:27
okay so I am using travel category only for this project
1:32:34
and travel category falls under which category group let me check it out that
1:32:41
as well or you can we can use PM as well
1:32:49
I'll use travel only for this category group is travel itself for travel
1:32:57
and quantity one and cost price I am giving
1:33:03
700 sales price it will pick let me post it
1:33:49
foreign
1:33:59
to cross check the main accounts uh how it it's booked
1:34:06
laser posting setup
1:34:40
okay done so now again once it is posted
1:34:46
I'll go to the project management tab many step and
1:34:53
posted transactions
1:35:08
this one which
1:35:18
see here project cost and Ledger
1:35:23
while booking only we have a offset account it is showing from where it is
1:35:30
speaking I'll show you uh first we'll go with debit account debit
1:35:38
account is Project cost account for travel it is
1:35:43
540210 -540210
1:35:49
and offset account it is speaking from the default offset account for expense
1:35:57
default offset accounts for expense
1:36:02
whenever you select that particular travel for travel 601 500 is the main
1:36:09
account mapped as a offset okay this is the one
1:36:14
so this is about expense Journal anyway maybe again we'll discuss same things in
1:36:22
the next episode as well starting of the episode and this is
1:36:28
just a beginning and let's go and create the fusional
1:36:36
fusional it will be Journal names from the fee journal and hover beginning
1:36:42
balance Journal it will be from uh project management I just showed you
1:36:48
right Journal Me journal name creation
1:36:53
so we can create Journal name from the project management itself
1:36:59
further hover V and beginning balance
1:37:09
um just
1:37:15
here okay and once a free Journal name is created
1:37:23
and whatever the default is in parameters that will pick uh when you
1:37:30
are booking the fee Journal let me go to that particular project
1:37:37
which we are doing postings
1:37:59
I'm going to feature now
1:38:06
so default Journal name given in the parameter level and this is the journal name created from the project management
1:38:13
accounting Journal names new
1:38:21
and it is fee category
1:38:28
I'm giving sales price as 900.
1:38:34
fee category falls under which group
1:38:42
why because why I am checking group because we there is a mapping at the
1:38:49
category group level main account fixed fee
1:38:54
fixed fee is the category and let's suppose the fee Journal
1:39:19
so once it's posted same way go to posted transactions of that particular
1:39:25
project manage tab poster transactions
1:39:35
so fee Journal is lost one View
1:39:43
so there is no transaction for this
1:39:49
okay for free Journal
1:39:59
it is because go to free Journal
1:40:06
it is not a cost rate it's not cost it's a sales sale price
1:40:12
using project
1:40:18
category group
1:40:29
so when you book the invoice for this particular fee Journal then you
1:40:37
can see the transaction how it's posted
1:40:46
otherwise I'll show you now itself let's go to invoice proposal
1:40:58
and select the free Journal click ok
1:41:31
then we have item Journal beginning balance journal and then we can stop
1:41:50
so I am directly posting it without changing anything
1:42:10
it's asking me without printout do you want to post yes I clicked ok
1:42:18
let's see how it will be
1:43:16
wow please post it there taking lots of time
1:43:25
okay done let me go to
1:43:34
web details
1:43:41
and voucher
1:43:47
so now when you are invoicing that fee Journal customer will be debited and
1:43:54
project invicer revenue revenue is credited
1:44:01
from where it is picking these accounts means this is from customer uh
1:44:11
and why how it is picking this account where we assign them uh
1:44:18
customer for that project I'll show you
1:44:25
for the project it we mapped project contract
1:44:31
so for the project contract it will be assigned with customer
1:44:37
so whenever you book the invoice it will be go to that particular customer
1:44:46
so here project contract is this one
1:45:04
funding source finding sources this customer
1:45:10
so if you go and check the uh posting profiles and air module you can
1:45:20
find what is the account method in relation to this customer so that from
1:45:26
there it is speaking that customer account and uh
1:45:32
four double one four double zero it is invoice revenue account
1:45:39
for that particular project four double one four double zero
1:45:45
I'll show you very we selected fee category fee
1:45:53
category falls under what a feed something is there
1:45:59
so let me go to postings
1:46:12
Ledger posting
1:46:18
four double one four double zero that is the account uh it's posted
1:46:26
where it is map Miss project Ledger postings
1:46:38
let me finish it first so
1:46:45
checking time
1:47:26
what happened let's keep on loading
1:47:35
so only two transactions spending item journal and uh
1:47:43
beginning balance Journal maybe we'll cover in the next session
1:47:49
I'll stop here after showing that main account from where it
1:47:57
is speaking sticking a lot of time
1:48:26
oh okay I'll stop here maybe you can go and check the transactions after posting the
1:48:33
fee journal from where and how it is speaking and what is the relation behind
1:48:41
picking that particular main account okay I'll stop here maybe in the next
1:48:47
session we'll cover uh more topics it's taking too much time so I'll stop
1:48:56
here thank you
#Business Operations