0:01
in 2025 Russia will limit the serial
0:03
production of military transport
0:05
aircraft to a single model the heavy i76
0:10
md9 or the IL 476 is a thorough
0:15
i76 there is presently no production of
0:18
smaller aircraft and there is a growing
0:20
demand to replace the Aging Fleet of
0:22
aircraft of various types which were
0:24
primarily assembled during the late USSR
0:27
era the Russian Air Force's largest
0:28
segment of this mix is approximately 140
0:32
light Transport a26 Aircraft each with a
0:35
payload capacity of up to 5.5 tons
0:39
initially the plan was to replace these
0:41
with the new i112 V but the situation
0:43
has proven to be more complex the
0:47
i112 vlight military transport aircraft
0:50
was first designed in the 2000s because
0:53
developers and military officials were
0:55
still unsure of how to pay for and
0:57
prioritize long-term projects this was
1:00
on top of the chaos in the aviation
1:01
industry that followed the destructive
1:04
1990s in approximately 2010 the vores
1:08
aircraft Factory initiated the Assembly
1:10
of the first prototype however the
1:13
Russian Ministry of Defense reduced
1:15
funding at that time and opted to
1:16
acquire the Ukrainian a140 in the cargo
1:20
version Ukraine and Russia plann to
1:23
jointly produce this aircraft at the
1:25
Avia cor plant in Samara the1 140t the
1:29
military transport version of the 2
1:31
engine A40 was designed to transport a
1:35
maximum load of 6 tons and a cargo
1:37
capacity of 5 tons for a distance of
1:40
1,860 KM the IL 112v was intended to
1:45
transport a maximum of 5 tons of cargo
1:48
for a distance of 1,200 km and it could
1:51
fly a maximum of 2,400 km with 3.5 tons
1:56
the a140 benefited from small scale
1:59
production carke from 1997 to 2005 the
2:04
passenger version of the a140 produced
2:07
11 aircraft Additionally the
2:09
documentation and developments for the1
2:12
140t were fully transferred to the
2:14
Russian side for independent use and
2:16
production as part of the 2013 agreement
2:19
between Russia and the former
2:21
Ukraine additionally Ukraine
2:23
successfully transferred the a140 to
2:26
Iran renaming it the n140 Iran assembled
2:30
a total of 14 aircraft out of a planned
2:36
2015 five or six of these aircraft are
2:38
still operational in the end the Russian
2:41
military anticipated receiving the1 140t
2:44
from Samara where the a1400 version was
2:48
being assembled and the production of
2:50
the1 140t was scheduled the Ukrainian
2:53
manufacturers were expected to finalize
2:56
the1 140t work and transfer the project
2:59
to the AV a COR facility the situation
3:02
appeared to be feasible however the
3:04
Ukrainian political change happened at
3:06
the start of 2014 resulting in a
3:08
breakdown of economic relations between
3:11
the two Nations at that time despite
3:14
intentions to produce the a 140 entirely
3:17
in Russia many components continued to
3:19
come from Ukraine the Russian airline
3:22
yakusa utilized individual aircraft
3:24
built in Samara for the a1400 version
3:28
ultimately the Russian milit was unable
3:30
to acquire the1 140t and ended up being
3:33
left with a limited number of1400
3:36
aircraft which are still in operation
3:39
today in 2016 the Russian military
3:42
entirely discontinued the production of
3:44
these aircraft the Russian military
3:46
Revisited the i112 V project and its
3:50
technological Independence at the end of
3:52
2013 to 14 the fuselage of the first
3:55
prototype which had been abandoned at
3:57
the vores aircraft Factory was revived
4:00
during this period in 2016 Koff
4:03
initiated the tv7 1117 St turboprop
4:07
engine development program and delivered
4:09
the first engines the il11 12v carried
4:13
out its inaugural flight successfully at
4:15
the vores factory airfield on March 30th
4:18
2019 but then more problems followed in
4:21
the history of this new military
4:23
transport aircraft it emerged that
4:26
substantial design enhancements were
4:28
required as the aircraft's we weight
4:29
exceeded the specified level thereby
4:32
reducing its flight range and payload
4:35
the aircraft developers expected to
4:37
resolve all issues within a 2 to
4:39
threeyear time frame the i112 V resumed
4:43
test flights in 2021 in the Moscow
4:46
region the experimental flight version
4:48
crashed during a landing approach in
4:50
August 2021 due to technical issues
4:53
involving a crew of three test
4:55
pilots routine investigations into the
4:58
circumstances led to the temporary
5:00
suspension of the project in February
5:03
2022 the project left two aircraft
5:06
unfinished and assembled one entirely
5:08
for ground strength tests a new aircraft
5:11
the IL 212 was announced in Autumn 2023
5:15
after the il1 12v was
5:18
discontinued however the subject was not
5:20
a modified version of the 112 but rather
5:23
a nearly entirely new aircraft the main
5:26
difference between the
5:27
i212 project and the IL L 112v is the
5:31
use of new Russian turbofan engines pd8
5:34
which are currently in the flight
5:35
testing phase as of early
5:38
20125 these engines were originally
5:40
designed for the regional passenger
5:42
aircraft suco superjet in its new import
5:45
substituted modification serial
5:48
production of the engine is anticipated
5:51
2027 by this date it is anticipated that
5:55
the Prototype military transport IL 212
5:58
will commence a assembly the transport
6:01
aircraft will employ two pd8 engines as
6:04
is the case with the new superjet the IL
6:06
212s 2024 configuration which involves
6:10
placing the engines above the wings
6:12
similar to the Soviet a72 and
6:15
ent4 will enable it to operate from
6:17
unprepared air strips increase the
6:20
maximum payload from 5 to 12 tons and
6:24
speed this aircraft is essentially a new
6:27
design although certain decisions from
6:29
the eye L 112v project may prove
6:32
advantageous we should reexamine the IL
6:34
214 project also known as the medium
6:37
Transport Aircraft this project was the
6:40
victim of another intergovernmental
6:42
collaboration this time between Russia
6:44
and India the twin engine aircraft was
6:47
intended to transport 12 tons for a
6:50
minimum of 2,000 km or in one version of
6:55
3,700 km at a maximum speed of 870 km
7:00
hour the aircraft was intended to be
7:02
equipped with engines that were
7:03
comparable to those found on the IL 76
7:07
md9 with ps90 engine modification or the
7:12
pd14 a variety of ambiguous
7:14
circumstances continually influenc the
7:17
development which spanned approximately
7:19
15 years the IL 214 was intended to
7:22
serve as a transitional product between
7:24
the IL 1112 V and the IL 76 md9 also
7:30
476 the project was renamed IL 276 in
7:34
2017 and it was intended to replace the
7:37
4 engine a12 however financial
7:40
difficulties forced its suspension in
7:42
2020 the IL 214 or IL 276s breakthroughs
7:47
are likely to be implemented in the new
7:51
i212 Russia recently again offered to
7:53
develop this plane with India probably
7:56
the offer terms have changed in India's
7:58
favor the 12 payload of the IL 212 no
8:02
longer qualifies it as a light Transport
8:05
Aircraft however it is anticipated to
8:07
achieve a dual purpose and bridge the
8:09
gap created by a larger aircraft set to
8:12
replace the a12 Sergey chov General
8:15
director of the rosc state Corporation
8:18
confirmed the IL 212 development during
8:20
a plenary session of the Federation
8:22
Council on October 23rd
8:25
2024 in December 2024 the latest round
8:29
of Western sanctions included the
8:30
Russian Enterprise odk Star which
8:33
develops and manufactures engine control
8:36
systems including the new Russian pd8
8:39
for the import substituted superjet this
8:42
was another confirmation of the ongoing
8:44
work on the new military transport
8:46
aircraft project according to Western
8:48
sources the new Russian military
8:52
i212 will also use this engine it's
8:55
crucial to recognize that no official
8:58
release of conceptual images of the new
9:00
aircraft has taken place despite the
9:03
fact that it would be irrational to
9:05
conceal a standard Transport Aircraft
9:08
all comparable foreign projects are
9:10
consistently disclosed during the
9:12
conceptual phase through computer
9:14
renderings now Russia will have to wait
9:16
until 2028 when it might see something
9:19
like the first prototype or it might
9:22
happen even later as the development of
9:24
any serious new aircraft as we mentioned
9:26
earlier takes more than 5 years from
9:30
concept to a flying model at best takes
9:32
5 years and the serial production
9:35
timeline usually requires just as much
9:37
time now do you think IL 212 will be a
9:43
2030 let us know in the comment please
9:46
like and share our videos and subscribe
9:48
to our Channel please also take
9:50
membership in our channel to encourage