0:01
the Prototype aircraft superjet 100 with
0:05
serial number 95157941839
0:30
Institute is conducting additional
0:31
flight tests on an upgraded pd8 engine
0:34
as part of a flying laboratory based on
0:36
the i76 LL aircraft as of early February
0:40
2025 the i76 LL had conducted over 20
0:44
flights the first pd8 engines have been
0:47
delivered to the kamol scammer aircraft
0:50
facility for testing on the short Hall
0:54
aircraft it is important to mention that
0:57
the regional airliner superjet 100 with
1:08
951570 the aircraft was equipped with
1:11
two domestic pd8 engines the Prototype
1:13
was initially intended to be in Flight
1:17
2023 and it was equipped with two
1:19
prototype pd8 engines with a declared
1:24
8,056 kg force and a bypass ratio of 4.4
1:29
and forign onboard equipment a second
1:31
prototype of the sj100 aircraft which is
1:34
expected to participate in Flight tests
1:36
in May of this year is equipped with pd8
1:39
engines and domestic onboard equipment
1:42
the standard configuration of the import
1:44
substituted superjet the sj100 will be
1:47
entirely replicated by this third
1:49
aircraft with tail number
1:52
97003 the first production sj100
1:55
aircraft with tail number
1:57
9704 has been powered up according to
2:00
the United aircraft Corporation UAC 11
2:04
airframes of Serial sj100 aircraft have
2:07
been assembled at the Comal ganam more
2:09
plant as of early February after their
2:12
certification these will be outfitted
2:14
with domestic pd8 engines onboard
2:16
systems and components import
2:18
substituted sj100 aircraft with pd8
2:22
engines are expected to be delivered in
2:24
February 2026 cret or the concern radio
2:27
electronic Technologies has also
2:30
manufactured a laser gyroscope
2:31
instrument for the superjet program
2:33
which has been introduced by Russia this
2:36
device is a critical component of nearly
2:38
all modern aircraft as it is capable of
2:40
detecting changes in angular
2:43
orientation laser gyroscopes exhibit a
2:46
substantially greater degree of
2:47
sensitivity than mechanical
2:49
gyroscopes the unit will be incorporated
2:52
into the equipment of the import
2:56
sj100 cre specializes in the development
2:59
of onboard inertial navigation systems
3:01
which are essential for contemporary
3:03
aircraft these systems are based on
3:07
gyroscopes these ins systems are
3:09
superseding conventional navigation
3:11
systems that are based on mechanical
3:13
gyroscopes and no longer meet modern
3:15
standards for accuracy reliability
3:18
durability and Readiness time this
3:20
device is either integrated with
3:22
satellite navigation systems or acts as
3:24
a complete replacement for them as far
3:27
as the mc21 project is concerned the cut
3:30
Aviation plant powered up the Prototype
3:32
of the completely import substituted
3:34
medium Hall airliner mc21 310 RS with
3:38
73057 in early February of this year it
3:42
is anticipated that this aircraft with
3:46
73057 Factory number MC
3:49
0013 which is equipped with completely
3:52
domestic components and has a wing
3:54
composed of Russian Composite Materials
3:57
will conduct its Maiden test flight in
3:59
the summer of this year previous reports
4:02
indicated April 2025 the mc21 3110 R
4:06
Us's final design which replaced foreign
4:09
components with domestic ones was
4:13
2024 the onboard equipment's weight and
4:15
size increased during this procedure the
4:19
state Corporation rosc has stated that
4:21
the mc21 310rs will eventually meet
4:24
customer specifications as restrictions
4:26
are progressively lifted during test
4:28
flights the initial plan was for the
4:30
first partially import substituted mc21
4:33
310 passenger aircraft to take off from
4:36
the arut aviation plant Airfield in late
4:40
2024 nevertheless the flight was not
4:43
conducted the Prototype aircraft which
4:45
Bears the factory number
4:48
MC12 is equipped with two Russian pd14
4:51
engines a wing composed of foreign
4:53
composite materials and numerous
4:55
domestic onboard systems her tail number
4:58
is 7305 5 the Assembly of mc21 310
5:02
airframes is currently underway at kkit
5:05
Aviation plant more than 10 airframes
5:08
have been built and they will be
5:09
subsequently equipped with domestic pd14
5:12
engines onboard systems and components
5:15
after they have been certified the
5:17
production of Serial mc21 310 airliners
5:20
is scheduled to commence in 2026 as per
5:23
the revised plans now do you think both
5:26
the aircraft will actually fly this year
5:29
let us us know in the comments please
5:31
like and share our videos and subscribe
5:34
to our Channel please also take
5:36
membership in our channel to encourage