0:04
On March 17th, 2025, the first test
0:07
flight of the Superjet 100 passenger
0:10
aircraft with the latest Russian PD8
0:12
engines took place in Kumosk
0:16
Aamur. The board was in the air for
0:18
about 40 minutes, reached a speed of 500
0:21
kmh and an altitude of up to 3,000 m,
0:25
confirming all the characteristics.
0:27
Previously, this engine rose into the
0:29
sky only as part of the IL76 flying
0:32
laboratory. Thus, March 17th can be
0:35
considered the official wedding day of
0:37
the new engine and the Super Jet if
0:40
expressed in the slang of aircraft
0:42
manufacturers. To fully understand the
0:44
importance of the moment, let us briefly
0:46
recall the difficult fate of the
0:48
Superjet, which became the first
0:50
civilian large-scale aircraft developed
0:52
in Russia after the collapse of the
0:56
In order to quickly bring it to
0:57
international markets, it was decided to
1:00
supply the novelty with SAM 146 engines
1:03
of French Russian production and other
1:06
foreign components. This allowed us to
1:08
quickly obtain all certificates and
1:10
enter foreign markets. While he was
1:13
never accepted there, one of the reasons
1:16
right. The problem of that engine and
1:20
specifically its hot part which was
1:22
produced by the French turned out to
1:24
require much more frequent overhaul.
1:26
After 2014, difficulties began with the
1:30
supply of imported components. And in
1:32
2022, the Europeans completely suspended
1:35
the certificate. But back in 2019, the
1:39
development of an updated aircraft began
1:41
in which about 40 systems had to be
1:48
opponents avionics, hydraulics, flight
1:51
control system, power supply, air
1:54
conditioning, fire protection,
1:56
navigation, and others. In fact, it was
1:59
about the creation of a new product
2:01
because in the aircraft industry, the
2:04
replacement of even one unit often
2:06
entails the need for a complete redesign
2:09
of new tests and long-term
2:12
That is why today there is not a single
2:15
country in the world that produces such
2:17
aircraft entirely on its own. Even in
2:19
Soviet times we relied on a wide network
2:22
of cooperations including not only the
2:25
Union republics but also foreign states.
2:27
However, now it was necessary to
2:29
reassemble the super jet and most
2:31
importantly to create a new engine for
2:34
it which is capable of only five
2:36
countries in the world including ours.
2:38
And this is what it follows.
2:47
Sometimes you have to hear that it takes
2:48
a very long time to create filter 8. But
2:50
this is an absurd statement because work
2:53
started only in 2020. And it is not
2:56
difficult to calculate that only 5 years
2:58
passed until one flight which is a
3:02
standards. And this despite the fact
3:04
that not everything went smoothly and
3:06
the engine had to be finalized literally
3:08
on the go. The high speed is explained
3:11
among other things by the fact that the
3:14
new engine used technologies and
3:15
approaches from its older brother PD14.
3:18
Nevertheless, the result is still
3:20
remarkable, especially taking into
3:22
account the fact that our enterprises
3:24
are implementing other complex projects
3:26
in parallel. Tests of the PD8 bring the
3:29
start of mass production of the updated
3:30
superjets closer. But here's what many
3:32
are talking about in this story. The
3:35
engine will give two life to another
3:45
B200. Our trouble is to fly the world's
3:48
only amphibious jet plane. In just 15
3:51
seconds, it is able to take on board 12
3:54
tons of water. Its land counterpart
3:56
during extinguishing, for example,
3:58
forest fires have to return to the
4:01
airfield each time to replenish tanks.
4:04
While the amphibian is able to perform
4:06
about 10 times as many fence discharge
4:08
cycles in the same time picking up water
4:10
from rivers, lakes or
4:13
seas. Every summer 200B help fight fires
4:16
across the country. They rarely go
4:19
abroad. When last year the fiery
4:21
apocalypse played out in California, we
4:24
reminded the Americans that earlier for
4:26
political reasons they abandoned the
4:28
contract for the purchase of 10 of our
4:30
aircraft in the SSH and there are no
4:33
analoges of their own and for
4:34
extinguishing they use a dozen outdated
4:37
Canadian turborops Canodia CL415 with
4:42
At the moment, we continue to produce
4:45
new BE200 at the Tagenrog plant and
4:48
execute an order for Algeria. It is high
4:51
time to replenish our own aircraft
4:53
fleet, but it was difficult due to the
4:55
lack of engines. The fact is that B200
4:58
was designed for engines of the D436
5:01
family developed by the Ukrainian
5:04
company ifo Progress and produced at the
5:07
company Motor. Although Russian
5:09
factories in particular the UFA motor
5:12
building plant, Unity also participated
5:14
in cooperation. A significant part of
5:17
the components including the gas
5:19
generator were produced by neighbors.
5:21
After the break of communication, we got
5:23
into a difficult situation, but the
5:26
reserve of engines and spare parts saved
5:28
us, which however are not endless.
5:31
Fortunately, this week the air rose
5:33
under an eight and will install it not
5:35
only on super jets but also on NAB 200
5:38
which will undoubtedly breathe life into
5:41
project 2. That's why it was so
5:43
important for us to create this a new
5:45
engine and preferably as soon as
5:47
possible. But what happens next? Two
5:50
more experimental engines PD8 will be
5:52
transferred for flight test in the
5:54
coming days. Receipt of the type
5:56
certificate is expected this autumn and
5:58
serial production of the updated super
6:01
jets next year at the production center
6:03
in Ksumsk on Ammo is already in varying
6:06
degrees of readiness. The first 22 cars.
6:09
We hope to restart the project
6:12
soon. We also do not forget about other
6:15
expected events which are already
6:17
undergoing tests of ground systems and
6:19
preparing for test flights. one
6:21
prototype of the MC21 aircraft with a
6:24
domestic engine and other systems and
6:28
U114300 continues certification flights
6:31
having already completed more than 20%
6:33
of the program. Work continues to expand
6:36
the production capacity of TU214
6:39
aircraft. So there are still a lot of
6:42
significant events ahead and we will
6:44
continue to tell you about them on our
6:46
channel. By the way, while we were
6:48
preparing this issue, it became known
6:51
about the second flight of the superjet
6:53
with PD8 during which he spent O24 in
6:57
the air, rising 2 and 1/2 times higher.
7:00
During the tests, the engines were
7:02
switched off and started in the air,
7:04
which is one of the important
7:07
stages. We wish all participants in the
7:10
process success and new achievements
7:12
further to other technologies.